HOME       GROUP       CONTACT       NEWS       DOWNLOAD
IT   DE   EN   FR
 
 
  Injections Systems
REFERENCES                SYSTEM                INFILTRATIONS                DAMPNESS                CONSOLIDATION                FAQ
 
Before the operation   Drytech restoration   After the operation
   
Milan subway: before the restoration the water reaches the rails.
  The Drytech operation takes place during the night interruption of the service, without limiting the normal daytime circulation of the trains.

  After restoration the tunnel stretch is perfectly dry.

The waterproofing operation is covered by Insurance Warrantee.
         

The Drytech® Restoration Systems are based on injection techniques. The advantages of this approach are:

> the flexibility which makes them applicable to structures of all types and sizes;

> the low invasiveness of operations, which does not affect normal use of the structures;

> the immediate checking;

Restoration was the first activity undertaken by Drytech, since the 1960s;

The techniques and technologies used today are therefore the result of an evolution more than 40 years old;

Restoration surveys: the solution begins from knowledge of the problem.

Through Engineering, Drytech also offers a service of preventive analysis of the restoration problems



 
linea
© 2012 - Drytech Group AG - All rights reserved